ZeroTrust Atlas Spatial Operating Environment

Lagos Utility Asset Verification Survey

SUR-LAG-ASSET-020 · Utility

Authoritative survey project

Lagos Utility Asset Verification Survey

Enterprise Assets survey programme demonstrating the multi-discipline Atlas platform.

Active Asset & Facility Management EPSG:4326
Assets 12,680 verified
Evidence coverage 88%
Region Lagos
Sector Enterprise Assets

Teams

1

Assigned field authorities

Control points

13

Registered monuments

Verified

11

Accepted through QA

Progress

In field

Current delivery state

Project authority

Professional identity and governance

Reference
SUR-LAG-ASSET-020
Client
Celteck Infrastructure
Principal surveyor
Enterprise Assets Survey Lead
Measurement system
Metric
Horizontal CRS
EPSG:4326
Vertical datum
EGM2008

Programme schedule

Operational delivery window

Start date
06 Jul 2026
Target completion
17 Oct 2026
Completed
Open programme
Last activity
2 hours ago

Assigned survey teams

Crews authorized to operate this project

ATLAS-EB3CF6C0

Atlas Enterprise Assets Division

Enterprise Assets Survey Lead

Operational

Quality posture

Current control-network assurance

85% control points verified

Mission operations

Live field execution attached to this Survey project

MSN-SUR-LAG-ASSET-020

Lagos Utility Asset Verification Survey Mission

Paused
Project
Lagos Utility Asset Verification Survey
Phase
Processing
Priority
Critical
Risk
Critical
Mission progress 63%
63%

Control-point register

Authoritative geodetic and project control

ENT-001

SUR-LAG-ASSET-020 Control 001

Type
Control
Condition
Verified
Coordinates
6.60235, 3.351775
Grid
E 500125.25 · N 700141.75
Horizontal accuracy
0.0101 m
Vertical accuracy
0.0201 m

ENT-002

SUR-LAG-ASSET-020 Control 002

Type
Control
Condition
Verified
Coordinates
6.6029, 3.35205
Grid
E 500250.5 · N 700283.5
Horizontal accuracy
0.0102 m
Vertical accuracy
0.0202 m

ENT-003

SUR-LAG-ASSET-020 Control 003

Type
Control
Condition
Verified
Coordinates
6.60345, 3.352325
Grid
E 500375.75 · N 700425.25
Horizontal accuracy
0.0103 m
Vertical accuracy
0.0203 m

ENT-004

SUR-LAG-ASSET-020 Control 004

Type
Control
Condition
Verified
Coordinates
6.604, 3.3526
Grid
E 500501 · N 700567
Horizontal accuracy
0.0104 m
Vertical accuracy
0.0204 m

ENT-005

SUR-LAG-ASSET-020 Control 005

Type
Control
Condition
Established
Coordinates
6.60455, 3.352875
Grid
E 500626.25 · N 700708.75
Horizontal accuracy
0.0105 m
Vertical accuracy
0.0205 m

ENT-006

SUR-LAG-ASSET-020 Control 006

Type
Control
Condition
Verified
Coordinates
6.6051, 3.35315
Grid
E 500751.5 · N 700850.5
Horizontal accuracy
0.0106 m
Vertical accuracy
0.0206 m

ENT-007

SUR-LAG-ASSET-020 Control 007

Type
Control
Condition
Verified
Coordinates
6.60565, 3.353425
Grid
E 500876.75 · N 700992.25
Horizontal accuracy
0.0107 m
Vertical accuracy
0.0207 m

ENT-008

SUR-LAG-ASSET-020 Control 008

Type
Control
Condition
Verified
Coordinates
6.6062, 3.3537
Grid
E 501002 · N 701134
Horizontal accuracy
0.0108 m
Vertical accuracy
0.0208 m

ENT-009

SUR-LAG-ASSET-020 Control 009

Type
Control
Condition
Verified
Coordinates
6.60675, 3.353975
Grid
E 501127.25 · N 701275.75
Horizontal accuracy
0.0109 m
Vertical accuracy
0.0209 m

ENT-010

SUR-LAG-ASSET-020 Control 010

Type
Control
Condition
Established
Coordinates
6.6073, 3.35425
Grid
E 501252.5 · N 701417.5
Horizontal accuracy
0.011 m
Vertical accuracy
0.021 m

ENT-011

SUR-LAG-ASSET-020 Control 011

Type
Control
Condition
Verified
Coordinates
6.60785, 3.354525
Grid
E 501377.75 · N 701559.25
Horizontal accuracy
0.0111 m
Vertical accuracy
0.0211 m

ENT-012

SUR-LAG-ASSET-020 Control 012

Type
Control
Condition
Verified
Coordinates
6.6084, 3.3548
Grid
E 501503 · N 701701
Horizontal accuracy
0.0112 m
Vertical accuracy
0.0212 m

ENT-013

SUR-LAG-ASSET-020 Control 013

Type
Control
Condition
Verified
Coordinates
6.60895, 3.355075
Grid
E 501628.25 · N 701842.75
Horizontal accuracy
0.0113 m
Vertical accuracy
0.0213 m

Operational deliverables

Survey outputs prepared for Atlas

Control network
Adjusted coordinates
Survey report

Project actions

Continue the operational workflow