ZeroTrust Atlas Spatial Operating Environment

Niger Flood Hazard Mapping

SUR-NGR-FLOOD-015 · Topographic

Authoritative survey project

Niger Flood Hazard Mapping

Disaster Management survey programme demonstrating the multi-discipline Atlas platform.

Active Public Safety & Disaster Management EPSG:4326
Risk zones 118 classified
Communities 64 assessed
Region Niger
Sector Disaster Management

Teams

1

Assigned field authorities

Control points

8

Registered monuments

Verified

7

Accepted through QA

Progress

In field

Current delivery state

Project authority

Professional identity and governance

Reference
SUR-NGR-FLOOD-015
Client
National Emergency Management Agency
Principal surveyor
Disaster Management Survey Lead
Measurement system
Metric
Horizontal CRS
EPSG:4326
Vertical datum
EGM2008

Programme schedule

Operational delivery window

Start date
11 Jul 2026
Target completion
12 Oct 2026
Completed
Open programme
Last activity
3 hours ago

Assigned survey teams

Crews authorized to operate this project

ATLAS-F3B80551

Atlas Disaster Management Division

Disaster Management Survey Lead

Operational

Quality posture

Current control-network assurance

88% control points verified

Mission operations

Live field execution attached to this Survey project

MSN-SUR-NGR-FLOOD-015

Niger Flood Hazard Mapping Mission

In Progress
Project
Niger Flood Hazard Mapping
Phase
Control Survey
Priority
High
Risk
Medium
Mission progress 37%
37%

Control-point register

Authoritative geodetic and project control

DIS-001

SUR-NGR-FLOOD-015 Control 001

Type
Control
Condition
Verified
Coordinates
9.93145, 5.598575
Grid
E 500125.25 · N 700141.75
Horizontal accuracy
0.0101 m
Vertical accuracy
0.0201 m

DIS-002

SUR-NGR-FLOOD-015 Control 002

Type
Control
Condition
Verified
Coordinates
9.932, 5.59885
Grid
E 500250.5 · N 700283.5
Horizontal accuracy
0.0102 m
Vertical accuracy
0.0202 m

DIS-003

SUR-NGR-FLOOD-015 Control 003

Type
Control
Condition
Verified
Coordinates
9.93255, 5.599125
Grid
E 500375.75 · N 700425.25
Horizontal accuracy
0.0103 m
Vertical accuracy
0.0203 m

DIS-004

SUR-NGR-FLOOD-015 Control 004

Type
Control
Condition
Verified
Coordinates
9.9331, 5.5994
Grid
E 500501 · N 700567
Horizontal accuracy
0.0104 m
Vertical accuracy
0.0204 m

DIS-005

SUR-NGR-FLOOD-015 Control 005

Type
Control
Condition
Established
Coordinates
9.93365, 5.599675
Grid
E 500626.25 · N 700708.75
Horizontal accuracy
0.0105 m
Vertical accuracy
0.0205 m

DIS-006

SUR-NGR-FLOOD-015 Control 006

Type
Control
Condition
Verified
Coordinates
9.9342, 5.59995
Grid
E 500751.5 · N 700850.5
Horizontal accuracy
0.0106 m
Vertical accuracy
0.0206 m

DIS-007

SUR-NGR-FLOOD-015 Control 007

Type
Control
Condition
Verified
Coordinates
9.93475, 5.600225
Grid
E 500876.75 · N 700992.25
Horizontal accuracy
0.0107 m
Vertical accuracy
0.0207 m

DIS-008

SUR-NGR-FLOOD-015 Control 008

Type
Control
Condition
Verified
Coordinates
9.9353, 5.6005
Grid
E 501002 · N 701134
Horizontal accuracy
0.0108 m
Vertical accuracy
0.0208 m

Operational deliverables

Survey outputs prepared for Atlas

Risk atlas
Evacuation routes
Flood model

Project actions

Continue the operational workflow