Bonny Pipeline Corridor Survey

SUR-BON-PIPE-013 · Utility

Authoritative survey project

Bonny Pipeline Corridor Survey

Oil & Gas survey programme demonstrating the multi-discipline Atlas platform.

Active Infrastructure, Utilities & Telecommunications EPSG:4326
Pipeline corridor 94 km
Crossings 67 verified
Region Rivers
Sector Oil & Gas

Teams

1

Assigned field authorities

Control points

13

Registered monuments

Verified

11

Accepted through QA

Progress

In field

Current delivery state

Project authority

Professional identity and governance

Reference
SUR-BON-PIPE-013
Client
Oil & Gas Programme Authority
Principal surveyor
Oil & Gas Survey Lead
Measurement system
Metric
Horizontal CRS
EPSG:4326
Vertical datum
EGM2008

Programme schedule

Operational delivery window

Start date
13 Jul 2026
Target completion
10 Oct 2026
Completed
Open programme
Last activity
2 hours ago

Assigned survey teams

Crews authorized to operate this project

ATLAS-131A1D90

Atlas Oil & Gas Division

Oil & Gas Survey Lead

Operational

Quality posture

Current control-network assurance

85% control points verified

Mission operations

Live field execution attached to this Survey project

MSN-SUR-BON-PIPE-013

Bonny Pipeline Corridor Survey Mission

In Progress
Project
Bonny Pipeline Corridor Survey
Phase
Control Survey
Priority
High
Risk
Medium
Mission progress 37%
37%

Control-point register

Authoritative geodetic and project control

OIL-001

SUR-BON-PIPE-013 Control 001

Type
Control
Condition
Verified
Coordinates
4.45215, 7.170975
Grid
E 500125.25 · N 700141.75
Horizontal accuracy
0.0101 m
Vertical accuracy
0.0201 m

OIL-002

SUR-BON-PIPE-013 Control 002

Type
Control
Condition
Verified
Coordinates
4.4527, 7.17125
Grid
E 500250.5 · N 700283.5
Horizontal accuracy
0.0102 m
Vertical accuracy
0.0202 m

OIL-003

SUR-BON-PIPE-013 Control 003

Type
Control
Condition
Verified
Coordinates
4.45325, 7.171525
Grid
E 500375.75 · N 700425.25
Horizontal accuracy
0.0103 m
Vertical accuracy
0.0203 m

OIL-004

SUR-BON-PIPE-013 Control 004

Type
Control
Condition
Verified
Coordinates
4.4538, 7.1718
Grid
E 500501 · N 700567
Horizontal accuracy
0.0104 m
Vertical accuracy
0.0204 m

OIL-005

SUR-BON-PIPE-013 Control 005

Type
Control
Condition
Established
Coordinates
4.45435, 7.172075
Grid
E 500626.25 · N 700708.75
Horizontal accuracy
0.0105 m
Vertical accuracy
0.0205 m

OIL-006

SUR-BON-PIPE-013 Control 006

Type
Control
Condition
Verified
Coordinates
4.4549, 7.17235
Grid
E 500751.5 · N 700850.5
Horizontal accuracy
0.0106 m
Vertical accuracy
0.0206 m

OIL-007

SUR-BON-PIPE-013 Control 007

Type
Control
Condition
Verified
Coordinates
4.45545, 7.172625
Grid
E 500876.75 · N 700992.25
Horizontal accuracy
0.0107 m
Vertical accuracy
0.0207 m

OIL-008

SUR-BON-PIPE-013 Control 008

Type
Control
Condition
Verified
Coordinates
4.456, 7.1729
Grid
E 501002 · N 701134
Horizontal accuracy
0.0108 m
Vertical accuracy
0.0208 m

OIL-009

SUR-BON-PIPE-013 Control 009

Type
Control
Condition
Verified
Coordinates
4.45655, 7.173175
Grid
E 501127.25 · N 701275.75
Horizontal accuracy
0.0109 m
Vertical accuracy
0.0209 m

OIL-010

SUR-BON-PIPE-013 Control 010

Type
Control
Condition
Established
Coordinates
4.4571, 7.17345
Grid
E 501252.5 · N 701417.5
Horizontal accuracy
0.011 m
Vertical accuracy
0.021 m

OIL-011

SUR-BON-PIPE-013 Control 011

Type
Control
Condition
Verified
Coordinates
4.45765, 7.173725
Grid
E 501377.75 · N 701559.25
Horizontal accuracy
0.0111 m
Vertical accuracy
0.0211 m

OIL-012

SUR-BON-PIPE-013 Control 012

Type
Control
Condition
Verified
Coordinates
4.4582, 7.174
Grid
E 501503 · N 701701
Horizontal accuracy
0.0112 m
Vertical accuracy
0.0212 m

OIL-013

SUR-BON-PIPE-013 Control 013

Type
Control
Condition
Verified
Coordinates
4.45875, 7.174275
Grid
E 501628.25 · N 701842.75
Horizontal accuracy
0.0113 m
Vertical accuracy
0.0213 m

Operational deliverables

Survey outputs prepared for Atlas

Control network
Adjusted coordinates
Survey report

Project actions

Continue the operational workflow