Authoritative survey project
Lagos Harbour Bathymetric Survey
Hydrographic survey programme demonstrating the multi-discipline Atlas platform.
Teams
Assigned field authorities
Control points
Registered monuments
Verified
Accepted through QA
Progress
Current delivery state
Project authority
Professional identity and governance
- Reference
- SUR-LAG-HYDRO-008
- Client
- Nigerian Ports Authority
- Principal surveyor
- Hydrographic Survey Lead
- Measurement system
- Metric
- Horizontal CRS
- EPSG:4326
- Vertical datum
- EGM2008
Programme schedule
Operational delivery window
- Start date
- 18 Jul 2026
- Target completion
- 05 Oct 2026
- Completed
- Open programme
- Last activity
- 2 hours ago
Assigned survey teams
Crews authorized to operate this project
ATLAS-89C66B96
Atlas Hydrographic Division
Hydrographic Survey Lead
Quality posture
Current control-network assurance
Mission operations
Live field execution attached to this Survey project
MSN-SUR-LAG-HYDRO-008
Lagos Harbour Bathymetric Survey Mission
- Project
- Lagos Harbour Bathymetric Survey
- Phase
- Quality Assurance
- Priority
- High
- Risk
- High
Control-point register
Authoritative geodetic and project control
HYD-001
SUR-LAG-HYDRO-008 Control 001
- Type
- Control
- Condition
- Verified
- Coordinates
- 6.42055, 3.390275
- Grid
- E 500125.25 · N 700141.75
- Horizontal accuracy
- 0.0101 m
- Vertical accuracy
- 0.0201 m
HYD-002
SUR-LAG-HYDRO-008 Control 002
- Type
- Control
- Condition
- Verified
- Coordinates
- 6.4211, 3.39055
- Grid
- E 500250.5 · N 700283.5
- Horizontal accuracy
- 0.0102 m
- Vertical accuracy
- 0.0202 m
HYD-003
SUR-LAG-HYDRO-008 Control 003
- Type
- Control
- Condition
- Verified
- Coordinates
- 6.42165, 3.390825
- Grid
- E 500375.75 · N 700425.25
- Horizontal accuracy
- 0.0103 m
- Vertical accuracy
- 0.0203 m
HYD-004
SUR-LAG-HYDRO-008 Control 004
- Type
- Control
- Condition
- Verified
- Coordinates
- 6.4222, 3.3911
- Grid
- E 500501 · N 700567
- Horizontal accuracy
- 0.0104 m
- Vertical accuracy
- 0.0204 m
HYD-005
SUR-LAG-HYDRO-008 Control 005
- Type
- Control
- Condition
- Established
- Coordinates
- 6.42275, 3.391375
- Grid
- E 500626.25 · N 700708.75
- Horizontal accuracy
- 0.0105 m
- Vertical accuracy
- 0.0205 m
HYD-006
SUR-LAG-HYDRO-008 Control 006
- Type
- Control
- Condition
- Verified
- Coordinates
- 6.4233, 3.39165
- Grid
- E 500751.5 · N 700850.5
- Horizontal accuracy
- 0.0106 m
- Vertical accuracy
- 0.0206 m
HYD-007
SUR-LAG-HYDRO-008 Control 007
- Type
- Control
- Condition
- Verified
- Coordinates
- 6.42385, 3.391925
- Grid
- E 500876.75 · N 700992.25
- Horizontal accuracy
- 0.0107 m
- Vertical accuracy
- 0.0207 m
HYD-008
SUR-LAG-HYDRO-008 Control 008
- Type
- Control
- Condition
- Verified
- Coordinates
- 6.4244, 3.3922
- Grid
- E 501002 · N 701134
- Horizontal accuracy
- 0.0108 m
- Vertical accuracy
- 0.0208 m
Operational deliverables
Survey outputs prepared for Atlas
Project actions
Continue the operational workflow