ZeroTrust Atlas Spatial Operating Environment

Lagos Fibre Backbone Expansion

SUR-LAG-FIBRE-005 · Utility

Authoritative survey project

Lagos Fibre Backbone Expansion

Telecommunications survey programme demonstrating the multi-discipline Atlas platform.

Active Infrastructure, Utilities & Telecommunications EPSG:4326
Fibre route 186 km
Network features 642 captured
Region Lagos
Sector Telecommunications

Teams

1

Assigned field authorities

Control points

12

Registered monuments

Verified

10

Accepted through QA

Progress

In field

Current delivery state

Project authority

Professional identity and governance

Reference
SUR-LAG-FIBRE-005
Client
Celteck Infrastructure
Principal surveyor
Telecommunications Survey Lead
Measurement system
Metric
Horizontal CRS
EPSG:4326
Vertical datum
EGM2008

Programme schedule

Operational delivery window

Start date
21 Jul 2026
Target completion
02 Oct 2026
Completed
Open programme
Last activity
2 hours ago

Assigned survey teams

Crews authorized to operate this project

ATLAS-214E2BA6

Atlas Telecommunications Division

Telecommunications Survey Lead

Operational

Quality posture

Current control-network assurance

83% control points verified

Mission operations

Live field execution attached to this Survey project

MSN-SUR-LAG-FIBRE-005

Lagos Fibre Backbone Expansion Mission

In Progress
Project
Lagos Fibre Backbone Expansion
Phase
Observation
Priority
Normal
Risk
Low
Mission progress 56%
56%

Control-point register

Authoritative geodetic and project control

TEL-001

SUR-LAG-FIBRE-005 Control 001

Type
Control
Condition
Verified
Coordinates
6.52495, 3.379475
Grid
E 500125.25 · N 700141.75
Horizontal accuracy
0.0101 m
Vertical accuracy
0.0201 m

TEL-002

SUR-LAG-FIBRE-005 Control 002

Type
Control
Condition
Verified
Coordinates
6.5255, 3.37975
Grid
E 500250.5 · N 700283.5
Horizontal accuracy
0.0102 m
Vertical accuracy
0.0202 m

TEL-003

SUR-LAG-FIBRE-005 Control 003

Type
Control
Condition
Verified
Coordinates
6.52605, 3.380025
Grid
E 500375.75 · N 700425.25
Horizontal accuracy
0.0103 m
Vertical accuracy
0.0203 m

TEL-004

SUR-LAG-FIBRE-005 Control 004

Type
Control
Condition
Verified
Coordinates
6.5266, 3.3803
Grid
E 500501 · N 700567
Horizontal accuracy
0.0104 m
Vertical accuracy
0.0204 m

TEL-005

SUR-LAG-FIBRE-005 Control 005

Type
Control
Condition
Established
Coordinates
6.52715, 3.380575
Grid
E 500626.25 · N 700708.75
Horizontal accuracy
0.0105 m
Vertical accuracy
0.0205 m

TEL-006

SUR-LAG-FIBRE-005 Control 006

Type
Control
Condition
Verified
Coordinates
6.5277, 3.38085
Grid
E 500751.5 · N 700850.5
Horizontal accuracy
0.0106 m
Vertical accuracy
0.0206 m

TEL-007

SUR-LAG-FIBRE-005 Control 007

Type
Control
Condition
Verified
Coordinates
6.52825, 3.381125
Grid
E 500876.75 · N 700992.25
Horizontal accuracy
0.0107 m
Vertical accuracy
0.0207 m

TEL-008

SUR-LAG-FIBRE-005 Control 008

Type
Control
Condition
Verified
Coordinates
6.5288, 3.3814
Grid
E 501002 · N 701134
Horizontal accuracy
0.0108 m
Vertical accuracy
0.0208 m

TEL-009

SUR-LAG-FIBRE-005 Control 009

Type
Control
Condition
Verified
Coordinates
6.52935, 3.381675
Grid
E 501127.25 · N 701275.75
Horizontal accuracy
0.0109 m
Vertical accuracy
0.0209 m

TEL-010

SUR-LAG-FIBRE-005 Control 010

Type
Control
Condition
Established
Coordinates
6.5299, 3.38195
Grid
E 501252.5 · N 701417.5
Horizontal accuracy
0.011 m
Vertical accuracy
0.021 m

TEL-011

SUR-LAG-FIBRE-005 Control 011

Type
Control
Condition
Verified
Coordinates
6.53045, 3.382225
Grid
E 501377.75 · N 701559.25
Horizontal accuracy
0.0111 m
Vertical accuracy
0.0211 m

TEL-012

SUR-LAG-FIBRE-005 Control 012

Type
Control
Condition
Verified
Coordinates
6.531, 3.3825
Grid
E 501503 · N 701701
Horizontal accuracy
0.0112 m
Vertical accuracy
0.0212 m

Operational deliverables

Survey outputs prepared for Atlas

Fibre route
Splice register
Capacity report

Project actions

Continue the operational workflow